Lots of Preparation for a Summer Cruise

For the past two months, Karen and I have spent some time each day working on Muse 10, readying her piece for this journey.

  • It all began with engine work:
  • Replace the motor mounts
  • Improve the refrigeration compressor stability
  • Paint the engine
  • Acid wash the heat exchanger
  • Epoxy the inspection port to the PSS
  • Replace the belts and coolant hoses
  • Change the oil and filter
  • Change the fuel filters
  • New thermostat gasket
  • Replace the seawater pump impeller
  • Inspect and replace any rusty hose clamps
  • Replace any hoses that look to have wear

That’s the starting list and the work is complete.